September 8, 2023

Goleta

Goleta Energy Storage

Building Goleta’s clean energy leadership.

In the small coastal city of Goleta, GridStor built the largest battery storage project in Santa Barbara County.

Located in the City of Goleta, Santa Barbara County, California

Boosting Electric Reliability

Our Goleta Energy Storage facility provides service to the larger California power system every day, bolstering reliability through moment-to-moment grid stabilization and storing ever more midday solar power for delivery in the evening. Locating our facility in Santa Barbara County also supports the greater build-out of wind and solar power in adjacent regions.

Being sited in Goleta also means our battery storage facility contributes to regional reliability. Santa Barbara communities along the southern California coastline from Point Conception to Lake Casitas draw their power from a single high-voltage transmission line. The region is prone to electricity supply disruptions from wildfires, mudslides, and earthquakes, which is one reason Santa Barbara County also continues to depend on nearby fossil fuel power plants. Goleta Energy Storage is part of the solution to fortifying the region and reducing reliance on fossil fuel generators.

KEYT News (June 8, 2023): City of Goleta partners with Portland-based GridStor for emission-free battery facility

Goleta Energy Storage by the numbers
60MW | 160MWh

battery energy storage system (BESS)

30,000

households powered daily through hours of peak demand

900MW

of wind and solar power supported in the region

2.6 acre

commercial lot

44

fully-integrated Tesla battery systems, manufactured in Lathrop, California

40

average number of full-time tradespeople employed over the construction phase, accounting for 35,000 hours

66 kV

interconnection at the SCE Isla Vista substation

17 years

contract to provide resource adequacy to utility Southern California Edison

“Clean energy storage projects like this one help move the City of Goleta toward its renewable energy goals and enhance our energy resilience. The addition of GridStor’s storage batteries to our grid brings closer the day that we will no longer need to rely locally on a gas-powered peaker plant.”

Paula Perotte

Mayor of Goleta

“With our state experiencing more frequent climate extremes such as record heat waves and droughts, it is essential to invest in innovative technologies like energy storage to make sure we can continue to reliably power the world’s 4th largest economy.”

– Elliot Mainzer

CEO of the California Independent System Operator

A Step Toward Decarbonizing California’s Economy

California is on a path to net zero greenhouse gas emissions by 2045. That’s why it is also the leader for grid-scale battery storage installations, with more than 6,000 MW online as of November 2023 and a plan to get to more than 13,000 MW by the end of the decade.

Our Goleta Energy Storage facility will operate every day, serving as one of a fleet of energy storage resources that ensure California has clean electricity to rely on, even when the wind isn’t blowing and the sun isn’t shining. Our initiative is helping the state meet its goal of a carbon-free electricity system by storing and utilizing more renewable energy and reducing reliance on polluting energy sources. 

Goleta in the news

Business Wire

GridStor Closes Goleta Tax Credit Transfer

Pacific Coast Business Times

Goleta unveils state’s largest battery energy facility

Energy Storage News

GridStor Starts commercial operations at 60MW/160MWh California battery storage facility

KSBY

30,000 households in Santa Barbara County now have access to clean energy

Santa Barbara Independent

The next chapter: GridStor begins installing emission-free batteries at new Goleta facility site
Read More

News 12

City of Goleta partners with Portland-based Gridstor for emission-free battery facility
Read more

Goldman Sachs

Utility grid–scale battery storage
Read more

Noozhawk

Gridstor Begins Construction on Battery Storage Facility in Goleta
Read More

Building a world where every community has clean energy around the clock.

GridStor builds and operates batteries on the American power grid storing electricity to deliver when and where it is most needed.

Building a world where every community has clean energy around the clock.
Our Partners